🌍 All Study Guides📊 Dashboard📰 Blog💡 About
Google Project Management Professional Certificate • STUDY MODE

FRAMEWORKS FOR SCALING AGILE

QUESTION 1 OF 65

What questions should you ask when there is a last-minute change, like the Bonsai tree supplier no longer carrying Bonsai trees? Select all that apply.

A
How can we make the minimum amount of changes and keep our release plan on track?
B
Do you need to consult anyone to make a decision?Correct Answer
C
Does the update require your team to take action?Correct Answer
D
Do you need additional information to help reach a decision?Correct Answer
Explanation:

This is one of the questions you would ask, as a sudden change will affect multiple team members and workflows. Explanation: This is one of the questions you would ask, since you want to immediately identify possible solutions. Explanation: This is one of the questions you would ask, as it helps you identify what you need to solve the problem.

QUESTION 2 OF 65

What are the best options for addressing the vendor database issue? Select all that apply.

A
Shut down all ordering and shipping until the problem can be solved
B
Purchase new software/new database
C
Go back to the old software temporarily while the new is being fixedCorrect Answer
D
Manually track inventory until the software is fixedCorrect Answer
Explanation:

If the old software is still available, this could be a good option—especially the fix will take some time. Explanation: This option is time-consuming, but will produce a correct inventory count.

QUESTION 3 OF 65

What are some possible options for addressing the Bonsai tree supply issue? Select all that apply.

A
Pass the issue along to someone else
B
Replace the Bonsai trees with a different plantCorrect Answer
C
Source Bonsai trees elsewhereCorrect Answer
D
Remove Bonsai trees from the website until you find a new vendorCorrect Answer
Explanation:

This is a good option if you are unsure when you will be able to source Bonsai trees. Explanation: This is a good option that can help you meet customer demand on time. Explanation: This is a good option if you cannot find a new vendor right away.

QUESTION 4 OF 65

Which two of the following are frameworks for scaling Agile in a larger organization?

A
DevOps
B
Business agility
C
Disciplined Agile Delivery (DAD)Correct Answer
D
Scrum of ScrumsCorrect Answer
Explanation:

DAD is a hybrid approach that combines strategies from various Agile frameworks. It provides a process foundation to manage details that other frameworks leave up to individual teams. Scrum of Scrums is another framework for scaling Agile. It integrates the work of multiple Scrum teams through coordination and communication. Explanation: Scrum of Scrums integrates the work of multiple Scrum teams working on the same project through coordination and communication. Disciplined Agile Delivery (DAD) is another framework for scaling Agile. It applies a hybrid approach that combines strategies from several Agile frameworks.

QUESTION 5 OF 65

Which scaled Agile framework coordinates multiple Scrum Teams and integrates their work to create one larger, cohesive deliverable?

A
Scrum of ScrumsCorrect Answer
B
Large-Scale Scrum (LeSS)
C
Disciplined Agile Delivery (DAD)
D
Scaled Agile Framework (SAFe)
Explanation:

Scrum of Scrums breaks teams of 12 or more people into smaller Scrum Teams and focuses on coordination among them. There is a Scrum Master for each team and a Scrum of Scrums Master who focuses on the Scrum process across teams.

QUESTION 6 OF 65

What is the benefit of business agility?

A
It helps teams rapidly evolve large-scale software systems.
B
It serves as a strict instruction manual for scaling Agile, rather than a general framework.
C
It combines software development with IT operations.
D
It helps organizations thrive in high-VUCA environments.Correct Answer
Explanation:

Business agility incorporates Agile principles into management. This helps organizations facing VUCA conditions such as volatility, uncertainty, complexity, and ambiguity.

QUESTION 7 OF 65

Imagine you are a project manager at a video game company. Your last large-scale software release contained so many technical issues that they upset your customers and overwhelmed your Developers. To ensure that your next rollout is secure and reliable, you recruit new team members with information technology (IT) expertise. Which of the following approaches is best for your new project?

A
Scaled Agile Framework (SAFe)
B
Large-Scale Scrum (LeSS)
C
Business Agility
D
DevOpsCorrect Answer
Explanation:

DevOps combines software development with IT operations. This framework increases delivery velocity and service reliability. DevOps helps teams quickly build large-scale systems while keeping them secure. WEEKLY CHALLENGE 4

QUESTION 8 OF 65

Fill in the blank: You can make sure your team delivers value to customers by building the right thing, building the thing right, and _____.

A
running it rightCorrect Answer
B
selling it right
C
scaling as fast as possible
D
running it cheaply
QUESTION 9 OF 65

Which of the following are components of a typical value roadmap? Select all that apply.

A
A release planCorrect Answer
B
A product roadmapCorrect Answer
C
A mission statement
D
A product visionCorrect Answer
E
A product playbook
QUESTION 10 OF 65

Fill in the blank: The product vision defines what the product is, who uses it, and how it supports the customer’s _____.

A
professional reputation
B
financial gains
C
business strategyCorrect Answer
D
release plan
QUESTION 11 OF 65

What are some of the benefits of developing and maintaining a product roadmap? Select all that apply.

A
Stakeholders meet with the Product Owner less frequently throughout the project
B
Stakeholders notice incremental value over the course of the projectCorrect Answer
C
Teams follow a reliable plan that does not need to change
D
Teams and stakeholders understand the sequence of deliverablesCorrect Answer
E
Teams understand how their efforts relate to the project visionCorrect Answer
QUESTION 12 OF 65

Imagine you are a project manager creating release plans for a new cloud storage service. Your team is performing well, so you decide to push up the estimated release date. Which specific factors do you take into account to make your decision?

A
The team’s willingness and work ethic
B
The team’s size and the customer’s budget
C
The team’s experience and the customer’s timeline
D
The team’s capacity and velocityCorrect Answer
QUESTION 13 OF 65

Imagine you are a project manager leading Agile adoption at an organization. Why is it important that you find an executive sponsor to support the change? Select all that apply.

A
It guarantees an increase in the project)s budget.
B
It increases your chances of successfully shifting organizational culture.Correct Answer
C
It helps to create a sense of ownership for the change you are creating.Correct Answer
D
It helps to answer your team’s questions about what’s working and what’s not working right now.
QUESTION 14 OF 65

Imagine you are a project manager overseeing the adoption of Agile at your organization. When setting goals for the project, you consider the timeline, specific results, and reason for the change. You put this information in a document the whole team can access. Which of the three keys to influence does this scenario demonstrate?

A
Clarify measurable resultsCorrect Answer
B
Find vital behaviors
C
Leverage the six sources of influence
QUESTION 15 OF 65

Imagine you are a project manager overseeing a new set design for a local news network. You notice your team is becoming overwhelmed with critical feedback from producers. Then, your team informs you that they no longer want to receive feedback from the producers. Which Agile principle do these issues impact the most?

A
Business collaborationCorrect Answer
B
Value delivery
C
Team dynamics and culture
D
Retrospectives
QUESTION 16 OF 65

What can you do to address instability when people leave and join your team frequently? Select all that apply.

A
Use financial incentives to keep team members from leaving.
B
Ask new team members to create up-to-date project documentation before starting work.
C
Use pair programming so new team members can learn on the job.Correct Answer
D
Create a quick onboarding process for new team members.Correct Answer
E
Schedule shorter sprints so departing team members can wrap up work.Correct Answer
QUESTION 17 OF 65

Which scaling method is not a true Agile framework, but can help organizations overcome the challenges of scaling?

A
The Spotify ModelCorrect Answer
B
Disciplined Agile Delivery (DAD)
C
Large-Scale Scrum (LeSS)
D
Scaled Agile Framework (SAFe)
QUESTION 18 OF 65

Does delivering value mean improving compliance adherence for a business?

A
Yes. Compliance adherence is the most valuable asset for a business, regardless of what the business needs to accomplish.
B
No. Value only refers to the financial benefits for a business.
C
Sometimes. Value can mean different things for each business based on what they hope to accomplish.Correct Answer
QUESTION 19 OF 65

Fill in the blank: A(n) _____ is a guide that demonstrates where to go, how to get there, and what to accomplish along the way in order to maximize value.

A
vision roadmap
B
release roadmap
C
capacity roadmap
D
value roadmapCorrect Answer
QUESTION 20 OF 65

Which of the following provides an overview of the expected product, its high-level requirements, and an estimated schedule for reaching milestones?

A
A product vision
B
A Product Backlog
C
A value playbook
D
A product roadmapCorrect Answer
QUESTION 21 OF 65

What are some common pitfalls of making a product roadmap? Select all that apply.

A
Let stakeholders think the roadmap is set and unchangeableCorrect Answer
B
Put more work into the roadmap than the deliverablesCorrect Answer
C
Conduct regular reviews of the roadmap with stakeholders and the team
D
Pressure teams to achieve deadlines no matter what it takesCorrect Answer
QUESTION 22 OF 65

Fill in the blank: When overseeing Agile adoption in your organization, you find an executive sponsor who supports the change. The sponsor can help create a sense of _____.

A
innovation
B
obligation
C
success
D
ownershipCorrect Answer
QUESTION 23 OF 65

Imagine you are a project manager overseeing the adoption of Agile at your organization. To smooth the transition, you define specific outcomes. You also make sure the measures are visible to the entire team throughout the change. Which of the three keys to influence does this scenario demonstrate?

A
Clarify measurable resultsCorrect Answer
B
Leverage the six sources of influence
C
Find vital behaviors
QUESTION 24 OF 65

Does a low level of interpersonal conflict mean that a team is experiencing issues?

A
Yes. A team that rarely has disagreements is not committed enough to the work.
B
No. A team that rarely has disagreements is more productive than a team that disagrees frequently.
C
Sometimes. If a team rarely has disagreements, it could mean team members don’t feel safe stating their opinions.Correct Answer
QUESTION 25 OF 65

Which of the following scaled Agile frameworks involve Scrum Masters meeting frequently to better coordinate work on a single product across teams.

A
Disciplined Agile Delivery (DAD)
B
Scaled Agile Framework (SAFe)
C
Scrum of ScrumsCorrect Answer
D
Large-Scale Scrum (LeSS)
QUESTION 26 OF 65

Which of the following are product roadmap best practices? Select all that apply.

A
Make the roadmap highly visible to stakeholders.Correct Answer
B
Make the roadmap highly noticeable to the team and refer to it frequently.Correct Answer
C
Inform the team you finalized the roadmap.
D
Conduct regular reviews with sponsors, stakeholders, and the team.Correct Answer
E
Indicate highest priority and highest value items.Correct Answer
F
Fine-tune delivery dates for accuracy well in advance.
QUESTION 27 OF 65

Fill in the blank: DevOps combines software development with _____.

A
Information Technology (IT) operationsCorrect Answer
B
Scrum operations
C
Change management operations
D
Business operations
QUESTION 28 OF 65

Fill in the blank: In a release plan, product releases happen when _____.

A
the team has developed a working version of a given feature or requirementCorrect Answer
B
the project is complete and the team has delivered the final product
C
the feature or requirement is in development and is being iterated upon
D
the customer has asked for the release of a given feature or requirement
QUESTION 29 OF 65

As a project manager, your organization makes a shift to Agile. To create a sense of urgency, which questions should you ask your team about what’s working, and what’s not working right now?

A
What allows our competitors to outperform us and get their products and features to market more quickly?Correct Answer
B
How can we help you become more productive and supported in your work?Correct Answer
C
What can we do to cut costs in our product creation and Sprint process?
D
How can we change the company)s stated mission or values to better align with our work?
QUESTION 30 OF 65

Imagine you are a project manager for a mobile game that is experiencing significant technical issues. While working on the update, your team members appear unhappy and arrive at work late. What can you do to boost morale and improve the quality of deliverables? Select all that apply.

A
Change up the workflows by pairing people to work together on hard tasksCorrect Answer
B
Run a team brainstorm session to identify areas for improvementCorrect Answer
C
Take a training class on team dynamics and how to better work togetherCorrect Answer
D
Push back the next release date to give the team more time
E
Require positive attitudes in team meetings
QUESTION 31 OF 65

What is the first Agile principle?

A
Satisfy the customer through value-driven deliveryCorrect Answer
B
Save the customer time through speed-driven delivery
C
Save the customer money through cost-driven delivery
D
Satisfy the customer through mission-driven delivery
QUESTION 32 OF 65

Which value-driven principle reflects that the team understands what the customer wants?

A
Run it right
B
Build the thing right
C
Build the right thingCorrect Answer
D
Deliver it right
Explanation:

To deliver value, teams need to build the right thing. To leverage this principle, the team can have a solution-oriented conversation with the customer to better understand what the customer wants and what their goals are.

QUESTION 33 OF 65

Which of the following common factors may result in changes to an Agile team’s release plan? Select all that apply.

A
Defined product goals and requirements
B
Change in team velocityCorrect Answer
C
Change to the product scopeCorrect Answer
D
Improved understanding of how much effort is needed to build certain featuresCorrect Answer
Explanation:

Velocity change impacts how much work the team can do in a given iteration or Sprint. This could be from adding team members, losing team members, or even improving efficiency. This new information about the team’s pace will likely impact the release plan. Explanation: If the Product Owner approves a change to the product, this will likely result in a change to the product scope. Fortunately, the release plan is a living artifact that can change based on the environment and new information. Explanation: The team may conduct research and discover that a user story or epic is more or less difficult than they originally anticipated. With this new knowledge, the release plan may need to change.

QUESTION 34 OF 65

Fill in the blank: It is crucial to understand organizational culture and the _____ process when introducing new ways of working.

A
risk management
B
project planning
C
change managementCorrect Answer
D
organizational structure
Explanation:

When an organization shifts the way it conducts business, it often means a shift in culture as well. The change management process can help organizations adopt an Agile approach.

QUESTION 35 OF 65

What can you do to create a sense of ownership among stakeholders when your organization shifts to Agile? Select all that apply.

A
Explain how other companies succeed with Agile.
B
Require employees to pass a test on Agile methodology.
C
Connect the change to the company’s mission or values.Correct Answer
D
Find an executive sponsor who also feels a sense of ownership and can advocate for the change you’re creating.Correct Answer
Explanation:

Sponsors can reinforce the benefits of Agile and give you the support and resources you need. Explanation: An organization that understands how Agile impacts culture is more likely to succeed.

QUESTION 36 OF 65

Which three of the following are solutions to value delivery issues?

A
Ensure changes to the Backlog are introduced only in between Sprints
B
Do more Demos of the solutions with the teamCorrect Answer
C
Use Retrospectives to ask the team if anything is slowing them downCorrect Answer
D
Focus on only a few user stories per SprintCorrect Answer
Explanation:

More Demos help to ensure the team is delivering on the value roadmap. Beyond additional Demos, the project manager can ask the team to focus on only a few user stories per Sprint and use Retrospectives to identify challenges. Explanation: Retrospectives can help to identify issues, like if the team is waiting on dependencies or experiencing communication challenges. The project manager can also try doing more solution Demos with the team and ask the team to focus on only a few user stories per Sprint. Explanation: If the team is experiencing value delivery issues, one solution is to focus on a few stories per Sprint and finish an item before moving on. The project manager can also do more solution Demos with the team and use Retrospectives to identify challenges.

QUESTION 37 OF 65

Which of the following are signs of team dynamics and culture issues? Select all that apply.

A
High team morale
B
Low team moraleCorrect Answer
C
Lots of team conflictCorrect Answer
D
Low team conflictCorrect Answer
Explanation:

If team members seem grumpy or irritated, there may be underlying team dynamics issues. Other signs of team dynamics and culture issues include lots of team conflict and low team conflict. Explanation: If the team argues and experiences unresolved issues this may negatively impact the team)s performance. Other signs of team dynamics and culture issues include low team morale and low conflict. Explanation: If the team has low team conflict, it may indicate that team members are worried about starting a conflict in an unsafe environment. Other signs of team dynamics and culture issues include low team morale and low conflict.

QUESTION 38 OF 65

Which of the following are solutions to an unstable product roadmap caused by product ambition? Select all that apply.

A
Conduct unbiased user research to gather information about what users really want
B
Agree up front how to handle new opportunitiesCorrect Answer
C
Set up regular roadmap reviews with the entire teamCorrect Answer
D
Promote sharing knowledge between the Product Owner and the Development TeamCorrect Answer
Explanation:

This agreement should define when new opportunities are reviewed and estimated and how customer or management commitments are made. Other solutions include setting up regular roadmap reviews and promoting knowledge sharing. Explanation: It is important to set regular roadmap reviews. These should happen at least quarterly to align everyone’s expectations. Other solutions include agreeing up front how to handle new opportunities and promoting knowledge sharing within the team. Explanation: Knowledge sharing ensures that the Product Owner knows how much effort the product takes to build and the team is aware of changes as early as possible. Other solutions include agreeing up front how to handle new opportunities and setting up regular roadmap reviews.

QUESTION 39 OF 65

What are the aims of the DevOps framework? Select all that apply.

A
Eliminate VUCA factors that affect projects in the real world
B
Improve service reliabilityCorrect Answer
C
Increase software delivery velocityCorrect Answer
D
Build shared ownership among software stakeholdersCorrect Answer
Explanation:

To launch products in a global environment, systems need to be both secure and reliable to better deliver value.The DevOps framework also aims to build shared ownership among software stakeholders and increase software delivery velocity. Explanation: Like all Agile frameworks, DevOps sets out to shorten the product life cycle and deliver software products continuously and with very high quality. One aspect of this is to increase software delivery velocity. DevOps also aims to improve service reliability and build shared ownership among software stakeholders. Explanation: DevOps is about growing and managing teams and organizations that can build and evolve large-scale systems at a rapid pace. One aspect of this is to build shared ownership. DevOps also aims to increase software delivery velocity and improve service reliability.

QUESTION 40 OF 65

When interviewing for an Agile project manager position, which questions should you ask to determine if you)ll be happy in the job? Select all that apply. What does your company do?

A
How often will I get to hear about the needs of our users or customers?Correct Answer
B
What would a typical day look like for me if I were to take on this position?Correct Answer
C
How supportive is the management toward blending project management approaches?Correct Answer
D
What)s the first thing I should know about the culture here?Correct Answer
Explanation:

An important part of every interview is when the candidate gets to ask the interviewers questions. You should take advantage of it. You can ask about blending management approaches, the culture of the organization, how often managers hear about customer needs, and what a typical day looks like. Explanation: You should take advantage of the chance to ask interviewers questions. You should ask about blending management approaches, workplace culture, how often managers hear about customer needs, and what a typical day will be like. Explanation: During your interview, you should take advantage of the chance to ask the interviewers questions. You should ask about blending management approaches, workplace culture, how often managers hear about customer needs, and what a typical day will be like. Explanation: Culture is crucial to the success of an Agile project. When given the opportunity, be sure to ask about the culture, management, and how often managers hear about customer needs. You should also ask about what a typical day will be like in the position.

QUESTION 41 OF 65

What are the components of a typical value roadmap?

A
A product roadmap, a mission statement, and release plans
B
A product vision, a mission statement, and development plans
C
A product vision, a product roadmap, and release plansCorrect Answer
D
A product roadmap, a vision statement, and development plans
QUESTION 42 OF 65

Imagine you’re a project manager creating a project roadmap. You meet with the Product Owner to estimate the team’s capacity and velocity—their ability to complete work at a certain pace. Which Agile principle does this scenario represent?

A
At regular intervals, the development team meets to reflect on how to become more effective.
B
Deliver working software frequently, with a preference to the shorter timescale.
C
Stakeholders and the team developers must work together daily throughout the project.
D
Agile processes promote sustainable development—the team developers should be able to maintain a constant workload.Correct Answer
QUESTION 43 OF 65

What two problems commonly arise when you fail to implement Scrum completely? Select all that apply.

A
A temptation to skip events or blend them to save timeCorrect Answer
B
A loss of clear roles and responsibilitiesCorrect Answer
C
An increase in interpersonal conflict
D
A decrease in customer satisfaction
QUESTION 44 OF 65

Which of the following scaled Agile frameworks involve Scrum Masters meeting frequently to better coordinate work on a single product across teams?

A
Large-Scale Scrum (LeSS)
B
Disciplined Agile Delivery (DAD)
C
Scaled Agile Framework (SAFe)
D
Scrum of ScrumsCorrect Answer
QUESTION 45 OF 65

What can you do to avoid making too many or unfounded product assumptions? Select all that apply.

A
Conduct surveys or focus groups to double-check assumptions, where necessary.Correct Answer
B
Discuss assumptions as a team.Correct Answer
C
Ask the Product Owner to double-check and approve assumptions.
D
Reuse assumptions from similar, past projects.
E
Document assumptions and make them transparent to all.Correct Answer
QUESTION 46 OF 65

As a project manager or Scrum Master, what can you do to ensure your team is focused on value-driven delivery? Select all that apply.

A
Run it fast
B
Build the thing rightCorrect Answer
C
Run it rightCorrect Answer
D
Build the right thingCorrect Answer
QUESTION 47 OF 65

What is the purpose of the product vision in a value roadmap? Select all that apply.

A
It defines a high-level view of product requirements.
B
It defines an estimated schedule for development.
C
It defines who will use the product.Correct Answer
D
It defines what the product is.Correct Answer
QUESTION 48 OF 65

Fill in the blank: As an Agile project manager, you constantly refer to a _____ to keep the team motivated by connecting the work they do in the sprints to a bigger picture.

A
high-value feature
B
product roadmapCorrect Answer
C
release date
D
project vision
QUESTION 49 OF 65

Which of the following are common factors that result in changes to the release plan? Select all that apply.

A
Better understanding of how much process space is needed
B
Better understanding of how much effort is neededCorrect Answer
C
Change to product scopeCorrect Answer
D
Change in team velocityCorrect Answer
QUESTION 50 OF 65

As a project manager, you help the product team adopt Agile values and workflow. To help the team with the change, you discuss with them what your competitors are doing to outperform your company in the market. What are you trying to make the team feel?

A
A sense of urgency
B
A sense of alertness
C
A sense of motivationCorrect Answer
D
A sense of ownership
QUESTION 51 OF 65

Imagine you are a project manager for a company that adopts a new invoicing process. You schedule training sessions so each team member can develop the individual skills they need to complete the new process. Which of the six sources of influence does this scenario demonstrate?

A
Social motivation
B
Personal abilityCorrect Answer
C
Social ability
D
Personal motivation
QUESTION 52 OF 65

You are a project manager overseeing the development of a new application. You notice a lack of motivation in your team and that many items are “in progress,” even though the deadline is tomorrow. Which Agile principle do these issues impact the most?

A
Team dynamics and culture
B
Retrospectives
C
Business collaboration
D
Value deliveryCorrect Answer
QUESTION 53 OF 65

What can cause an unstable product roadmap? Select all that apply.

A
Product vision
B
Product plan
C
Product assumptionsCorrect Answer
D
Product ambitionCorrect Answer
QUESTION 54 OF 65

As a project manager, what questions can you ask your Agile team to ensure they “run it right”? Select all that apply.

A
How can the product reach more users?
B
How will users get updates and new features?Correct Answer
C
What long-term value will this product give users?Correct Answer
D
How will a user get support?Correct Answer
QUESTION 55 OF 65

You create a release plan for a new project. You include the estimated release date, company holidays and the business goals. What else can you add to this release plan to help the team stay focused?

A
Feedback from stakeholders on the project timeline
B
Use cases for the features in the release
C
Milestones for the development of future releases
D
A backlog of items required for the release goalCorrect Answer
QUESTION 56 OF 65

As a project manager, you plan the release dates for your new project. What release date(s) should never be moved?

A
Only the last
B
None of them
C
All of them
D
Only the firstCorrect Answer
QUESTION 57 OF 65

As a project manager, your organization makes a shift to Agile. To create a sense of ownership, what actions should you take? Select all that apply.

A
Schedule regular meetings to discuss the change
B
Create a feedback loop for the change
C
Have buy-in from an executive on the changeCorrect Answer
D
Align your company’s mission with the changeCorrect Answer
QUESTION 58 OF 65

You are a project manager for a company that is changing their feedback reporting process. To facilitate this change, you create a form for each team member to fill out every week. You send out a reminder email two days before the form is due. Which of the six sources of influence does this scenario demonstrate?

A
Social motivation
B
Personal ability
C
Structural abilityCorrect Answer
D
Personal motivation
QUESTION 59 OF 65

In which component of the roadmap will you store information about important dates that indicate delivery of certain features to the customer?

A
Release planCorrect Answer
B
Interview plan
C
Requirement plan
D
Process plan
QUESTION 60 OF 65

What defines the product, who uses it, and how it supports the customer’s business strategy?

A
A product backlog
B
A product visionCorrect Answer
C
A product roadmap
D
A value playbook
QUESTION 61 OF 65

What is the measure of the team’s ability to complete work at a certain pace?

A
A product roadmap
B
A release plan
C
Capacity and velocityCorrect Answer
D
Story and epic
QUESTION 62 OF 65

How often should stakeholders and team members review a project roadmap?

A
Multiple times during the execution phase
B
Multiple times throughout all stages of the projectCorrect Answer
C
Once at the beginning of the planning phase
D
Once at the end when the product is delivered
QUESTION 63 OF 65

You are a project manager in the initial stages of planning a project. You want to closely adhere to the Agile principle of maintaining a constant pace. What factor is important to establish and monitor as the project progresses?

A
Product vision
B
Story and epic
C
Project roadmap
D
Team capacity and velocityCorrect Answer
QUESTION 64 OF 65

As a project manager, you need to rebuild trust and collaboration between the development team and the business team. What actions can you take to accomplish this? Select all that apply.

A
Conduct a Solution Design sprintCorrect Answer
B
Address critical feedback with more demosCorrect Answer
C
Focus on fewer user stories per sprint
D
Add changes to backlog only in between sprintsCorrect Answer
QUESTION 65 OF 65

What are signs of value delivery issues? Select all that apply.

A
Team members are working long hours.Correct Answer
B
Tasks are in progress for longer than usual.Correct Answer
C
The team has stopped asking business people for feedback.
D
Collaboration between team members has declined.

Ready to test your recall?

What questions should you ask when there is a last-minute change, like the Bonsai tree supplier no longer carrying Bonsai trees? Select all that apply.

💡Select all 3 correct answers before submitting (0 of 3 selected).
A
How can we make the minimum amount of changes and keep our release plan on track?
B
Do you need to consult anyone to make a decision?
C
Does the update require your team to take action?
D
Do you need additional information to help reach a decision?

How confident are you in this answer?