Quality Management

Course 4 – Project Execution: Running the Project QUIZ ANSWERS

Week 2:  Quality Management and Continuous Improvement

Google Project Management: Professional Certificate

Coursera Answers & Study Guide

Quality Management and Continuous Improvement INTRODUCTION

In this Coursera Google Project Management: Professional Certificate course, you will explore the fundamentals of quality management and continuous improvement. You will be introduced to techniques for managing quality and communicating with customers. Additionally, you will learn how to measure customer satisfaction as well as different process improvement techniques, such as retrospective analysis.

By the end of this course, you should have a better understanding of how to manage quality in order to achieve optimal outcomes effectively.

Overall, the goal is to equip students with all the tools necessary for successful Quality Management and Continuous Improvement strategies. With these new skills, learners will be able to create lasting improvements in their projects that can yield greater success over time.

Learning Objectives

  • Explain the key quality management concepts of quality standards, quality planning, quality assurance, and quality control.
  • Explain the importance of effective communication with customers and discuss different ways to measure customer satisfaction.
  • Define continuous improvement and process improvement and apply them to different project scenarios.
  • Describe how to create continuous improvement through data-driven improvement frameworks.
  • Compare projects, programs, and portfolios and assess how all three can work together to drive continuous improvement in an organization.
  • Explain the purpose of a retrospective and describe how to conduct one.

TEST YOUR KNOWLEDGE: QUALITY MANAGEMENT

1.  As a project manager, you conduct a process to determine which standards of quality are relevant to the project and how to satisfy them. Which quality management concept does this describe?

  • Quality planning (CORRECT)
  • Quality assurance
  • Quality control
  • Quality standards

Correct: During the quality planning process, the project manager determines exactly which quality standards are relevant to the project plan and the procedures for how to achieve them.

2. Which quality management concept—often set at the beginning of a project—uses multiple guidelines, such as reliability and usability, to ensure its desired outcome?

  • Quality control
  • Quality standards (CORRECT)
  • Quality planning
  • Quality assurance

Correct: Project managers set multiple quality standards to help the team achieve their desired outcome. When the team defines high-quality standards, the results are clear expectations and less rework.

3. As a project manager, you and your team monitor project results and delivery to determine if the desired results are being met. If issues are identified, you take corrective action to resolve them. Which quality management concept does this describe?

  • Quality planning
  • Quality control (CORRECT)
  • Quality standards
  • Quality assurance

Correct: Quality control includes the techniques that are used to ensure quality standards are maintained when a problem is identified. Additionally, quality control helps the project manager learn how to successfully land future projects as they review and improve the current project’s results.

4. As a project manager, you and your team conduct a review process. Your goal is to evaluate whether the project is moving toward delivering a high-quality service or product and to prevent defects before they occur. Which quality management concept does this describe?

  • Quality planning
  • Quality assurance (CORRECT)
  • Quality standards
  • Quality control

Correct: Quality assurance includes regular audits to confirm that everything is going to plan and that the necessary procedures are being followed. Quality assurance spans the whole project life cycle.

5. Which quality management concept is about evaluating if a project is moving towards delivering a high-quality service or product?

  • Quality assurance (CORRECT)
  • Quality standards
  • Quality control
  • Quality planning

Correct: Quality assurance, or QA, spans the project life cycle. QA is about monitoring the project to confirm it will deliver a high-quality service or product. This comes after quality planning and before quality control.

TEST YOUR KNOWLEDGE: COMPLIE FEEDBACK TO MEASURE SATISFACTION

1. A project manager should ask open-ended questions when utilizing which of the following three interpersonal skills?

  • Trust-building (CORRECT)
  • Negotiating (CORRECT)
  • Empathetic listening (CORRECT)
  • Tool understanding

Correct: When a project manager asks open-ended questions, they are more likely to build trust because their teammates will feel more understood. It’s also helpful for a project manager to ask open-ended questions when negotiating and listening.

Correct: By asking open-ended questions during a negotiation, a project manager can better understand the needs and perspectives of the person they’re negotiating with. A better understanding will help build a successful partnership. It’s also helpful for a project manager to ask open-ended questions when listening and trying to build trust.

Correct: By asking open-ended questions, a project manager can understand someone’s frustrations and address those frustrations with a solution that’s beneficial to both parties. It’s also helpful for a project manager to ask open-ended questions when negotiating and trying to build trust.

2. When is an optimal time to send out a feedback survey?

  • Only after a product or service launches
  • Only before a product or service launches
  • Both before and after a product or service launches (CORRECT)

Correct: Sending out surveys before a launch can help you make improvements before mass adoption by customers. Surveying after a launch can help you measure success and make future improvements.

3. What are the main goals of a user acceptance test (UAT)? Select all that apply.

  • To demonstrate that the product, service, or process is behaving in expected ways in real-world scenarios (CORRECT)
  • To persuade potential customers to use the new product, service, or process
  • To identify issues that need to be addressed before considering the project to be done (CORRECT)
  • To confirm that the product, service, or process is working as intended (CORRECT)

Correct: UAT allows the team to gather detailed information about how users interact with a product, service, or process in conditions that simulate the real world.

Correct: During UAT, the team will record any technical issues that users may have had. They will also record any change requests from users. The team can then use this information to improve the product, service, or process.

Correct: When a feature works as intended during the testing process, the team can be more confident that the product, service, or process will work properly once it is launched.

4. As a project manager running a user acceptance test (UAT), you take your users through a sequence of steps to accomplish tasks in your product. What is the term for these steps?

  • Acceptance criteria
  • Feedback survey
  • Critical user journey (test cases) (CORRECT)
  • Edge cases

Correct: A critical user journey gives users a visual representation or mock up of your product or asks them to go through a demo.

5. Which of the following are best practices for running an effective UAT? Select all that apply.

  • Define and write down the acceptance criteria. (CORRECT)
  • Determine user credentials and access permissions the day of the test.
  • Create test cases for each item being tested. (CORRECT)
  • Write UAT scripts based on user stories. (CORRECT)
  • Let users decide their own plan for the testing process.

Correct: Project managers should write down acceptance criteria for each item they intend to test. They should also create test cases for each item being tested and write UAT scripts based on user stories.

Correct: A test case is a sequence of steps and its expected results. I (The term test case may be used interchangeably with critical user journey.) They should also define and write down the acceptance criteria and write UAT scripts based on user stories.

Correct: A user story is an informal, general explanation of a feature written from the perspective of the end user. They should also define and write down the acceptance criteria and create test cases for each item being tested.

6. What is the benefit of a user acceptance test (UAT)?

  • It fixes any bugs or issues that the project team identifies.
  • It helps a business make sure that a product or solution works for its users. (CORRECT)
  • It provides a sequence of steps users follow to accomplish tasks in a product.

Correct: A user acceptance test, or a UAT, is a test that helps a business make sure that a product or solution works for its users. A UAT must meet the agreed-upon requirements and deliver the expected results.

TEST YOUR KNOWLEDGE: CONTINUOUS IMPROVEMENT

1. Fill in the blank: _____ is an ongoing effort to improve products or services. It begins with a project manager recognizing processes and tasks that they should create, eliminate, or improve.

  • Process improvement
  • Continuous improvement (CORRECT)
  • Experimental improvement
  • Control improvement

Correct: Continuous improvement is an ongoing effort to improve products or services. It begins with recognizing when processes and tasks need to be created, eliminated, or improved.

2. As a project manager, you decide to use a continuous improvement framework to help you measure success. The framework you choose has a step that involves conducting performance metrics and data collection to establish baselines. Which framework does this describe?

  • UAT
  • DMAIC (CORRECT)
  • KPI
  • PDCA

Correct: DMAIC stands for define, measure, analyze, improve, and control. Conducting performance metrics and data collection occur during the measure step.

3. Which continuous improvement framework does the following scenario represent?

A project manager identifies an ongoing communication issue where a vendor isn’t getting notified about product shipments. To fix the problem, they first plan additional communication strategies. Next, they implement one of their strategies—send an additional email after each shipment. Then, they check to verify that the customer receives the email. Finally, they review the process to fine-tune and ensure continuous improvement.

  • UAT
  • DMAIC
  • PDCA (CORRECT)
  • KPI

Correct: PDCA stands for plan, do, check, and act. The 4-step process focuses on identifying a problem, fixing the issue, assessing whether the fix was successful, and fine-tuning the final fix.

4. What’s the main difference between a program and a portfolio?

  • A program contains better-organized projects than a portfolio.
  • A program contains current projects, whereas a portfolio contains previous projects.
  • A portfolio contains more complex projects than a program.
  • A program is a collection of projects, whereas a portfolio is a collection of both projects and programs across an entire organization. (CORRECT)

Correct: Projects can exist inside of programs, which can exist inside of portfolios.

5. A construction company tests a strategy to reduce costs on a collection of projects. This experiment is part of a long-term business objective. What position would most likely oversee this test across several projects?

  • Program manager (CORRECT)
  • Portfolio manager
  • Project manager
  • Primary stakeholder

Correct: A program manager supervises groups of projects and focuses on long-term business objectives.

6.  In which step of the DMAIC framework do you work to find the root causes of problems and understand their impact?

  • Define (D)
  • Measure (M)
  • Analyze (A) (CORRECT)
  • Improve (I)
  • Control (C)

Correct: The DMAIC framework maps out five steps that you can take when working toward continuous improvements. In the analyze step, you work to find the root causes of problems and understand their impact.

7. What role does a program manager play in an organization?

  • A program manager oversees individual projects and has short-term, concrete deliverables.
  • A program manager supervises a group of projects and programs and provides centralized management of them.
  • A program manager supervises groups of projects and focuses on long-term business objectives. (CORRECT)
  • A program manager oversees the individual work of team members on a daily basis.

8. What are the three main purposes of holding a retrospective? Select all that apply.

  • Recycle old habits, procedures, and processes
  • Encourage team building (CORRECT)
  • Facilitate improved collaboration on future projects (CORRECT)
  • Promote positive changes in future procedures and processes (CORRECT)

Correct: Retrospectives are a form of process improvement typically conducted as a workshop or meeting. They encourage team building, improved collaboration, and positive changes in future procedures and processes.

Correct: Retrospectives are held at the end of a project or after major milestones and are typically conducted as a workshop or meeting. Retrospectives encourage team building, improved collaboration, and refinement of processes and procedures.

Correct: Retrospectives are a form of process improvement. There is no exact formula for a productive retrospective, though they are typically conducted as a workshop or meeting. Retrospectives encourage team building, improved collaboration, and future refinement of processes and procedures.

TEST YOUR KNOWLEDGE: RETROSPECTIVES

1. A project manager sends out an anonymous team survey for feedback after a customer reports they’re not happy with a product feature. Then, the project manager calls a team meeting to discuss the feedback in the survey. During the meeting, the project manager asks the team to use “we” language instead of “you” language. At the end of the meeting, the team discusses what lessons the team will carry into future work.

Which three retrospective best practices are the project manager and team following?

  • Don’t focus only on the negative (CORRECT)
  • Use a time-boxed agenda
  • Change perspective (CORRECT)
  • Be blameless with teammates (CORRECT)

Correct: By asking the team what lessons they will carry into future projects, the project manager focuses the discussion in a positive direction. The project manager also helps create a blameless environment by changing perspective and seeking anonymous feedback.

Correct: In this scenario, the project manager helps to create a blameless retrospective by switching the team from “you” language to “we” language. This makes everyone feel comfortable giving candid feedback. The project manager also helps to create a blameless environment by seeking anonymous feedback and focusing on the positive aspects of the project.

Correct: The project manager is trying to figure out what went wrong with the project tasks, and they want to maintain a blameless environment. When the project manager sends an anonymous survey, they help the team feel comfortable giving candid feedback. The project manager also focuses on the positive aspects of the project and helps to create a blameless environment by changing perspective.

2. What are the main purposes of a retrospective? Select all that apply.

  • Eliminate all team miscommunications
  • Encourage team-building (CORRECT)
  • Facilitate improved collaboration (CORRECT)
  • Promote positive changes

Correct: Retrospectives are great for team-building because they enable teammates to better understand each other’s perspectives. They are also useful for promoting positive changes and facilitating improved collaboration.

Correct: Because retrospectives provide a time for teammates to communicate and reflect on the project together, they facilitate improved collaboration on the current project and future projects. Retrospectives are also useful for promoting positive changes and encouraging team-building.

Correct: The emphasis in retrospectives is on continuous improvement and change. This helps teams avoid recycling old and potentially unhelpful habits, procedures, and processes. Retrospectives are also useful for encouraging team-building and facilitating improved collaboration.

3. What are some typical reasons for holding a retrospective? Select all that apply.

  • Kicked off a new project
  • Delivered a new product (CORRECT)
  • Missed deadlines or expectations (CORRECT)
  • Reached the end of a Sprint (CORRECT)

Correct: Holding a retrospective just after product delivery helps your team record key lessons learned and improve future processes. You might also conduct a retrospective when there have been missed deadlines or miscommunications between stakeholders, or at the end of a Sprint.

Correct: Even if you plan for every possible risk, odds are that something will still sneak up on you. When something does fall through the cracks and you need to reflect on it with the team, you may want to conduct a retrospective. You might also conduct a retrospective at the end of a Sprint or after launching a new product.

Correct: A Sprint is a series of ordered tasks ending in a goal. The end of a Sprint is a great opportunity to record key lessons that other people might learn from later on in the project. You might also conduct a retrospective when there have been missed deadlines, miscommunications between stakeholders, or after launching a new product.

4. Fill in the blank: As a project manager, the way you choose to structure your retrospective will depend on _____.

  • your project scope
  • your team and workplace (CORRECT)
  • your project budget
  • your customer

Correct: There’s no exact formula or template for a productive retrospective. The way you choose to structure your retrospective will depend on your team and workplace. You may decide to conduct a formal, in-person retrospective, or you may decide a virtual or online retrospective is a better option.

GOOGLE PROJECT MANAGEMENT COURSERA ANSWERS AND STUDY GUIDE

Liking our content? Then don’t forget to ad us to your bookmarks so you can find us easily!

Weekly Breakdown | Google Study Guides | Back to Top

Project Execution: Running the Project WEEKLY CHALLENGE 2

1. As a project manager overseeing a product launch, you monitor and inspect the results to ensure the project is meeting the quality standards. You notice one standard is not being met and take corrective action to improve the standard. Which quality management concept does the inspection and corrective action represent?

  • Quality planning
  • Quality control (CORRECT)
  • Quality assurance
  • Quality standards

2. Which quality management concept takes place throughout the entire project lifecycle and focuses mainly on audits and testing during the development process?

  • Quality control
  • Quality planning
  • Quality assurance (CORRECT)
  • Quality standards

a

3. As a project manager, you learn that a product is behind schedule. After communicating the delay to the customer, you listen to their frustrations, address them, and find a solution beneficial for both of you. Which soft skill does this represent?

  • Work ethic
  • Networking
  • Trust-building
  • Empathetic listening (CORRECT)

4. As a project manager, you’re doing a user acceptance test (UAT) to test your product. You present your users with the visual mockup of the product and walk them through each step they need to take to use the product. What UAT quality control step does this scenario represent?

  • User story
  • Edge case journey
  • Critical user journey (CORRECT)
  • Acceptance criteria

5. How should a project manager engage in continuous improvement that enhances team performance?

  • Team improvement
  • Process improvement (CORRECT)
  • Behavioral improvement
  • Quality improvement

6. As a project manager, you have already identified a process-based problem to improve, found its root cause, and implemented a solution. Now, you take the next step: You monitor the new process to ensure the changes are beneficial to the team. Which DMAIC step are you currently applying?

  • Improve
  • Define
  • Analyze
  • Control (CORRECT)

7. As a project manager, you learn a customer is not satisfied with the quality of a finished product. You have already identified the root cause and brainstormed solutions to the problem with the team. Now, you and the team attempt to fix the problem by implementing a solution. Which PDCA step did you apply?

  • Plan (INCORRECT)
  • Do
  • Check
  • Act (CORRECT)

8. Who can take a beneficial process improvement from one project and implement it across several projects?

  • Project manager
  • Program manager (CORRECT)
  • Portfolio manager
  • Stakeholder manager

9. Fill in the blank: The way a project manager decides to structure a retrospective depends on _____.

  • team and workplace (CORRECT)
  • the latest project management trends
  • project sponsor preference
  • the previous project manager’s agenda

10. What’s the main purpose of holding a retrospective?

  • Determine why the team missed a milestone and update the client
  • Let stakeholders give feedback so the team can get a different perspective
  • Encourage improvements that prepare the team for future projects (CORRECT)
  • Allow the project manager to explain why the project did or did not succeed

11. As a project manager, you’re overseeing the launch of a new product: a portable, solar-powered stove. Before beginning the project, you set a criteria for the desired outcome: It must maintain a specific cooking temperature for a set period of time. Which quality management concept does this criteria represent?

  • Assurance planning
  • Quality planning
  • Quality standards (CORRECT)
  • Quality control

12. To receive authentic and honest feedback from customers, what strategy should a project manager use?

  • Ask for feedback after the project finishes because customers won’t fully understand the product until it’s complete
  • Ask for stakeholder feedback and relay it to customers in hopes to close the gap between the customer’s expectation and the project’s needs
  • Ask open-ended questions and listen to the customer’s current state versus their desired state (CORRECT)
  • Incentivize customers with a gift card because they’re more likely to respond

13. During a user acceptance test (UAT), the users identify outliers that the original requirements didn’t account for, such as an extreme use of the product. What UAT quality control step does this represent?

  • Business cases
  • Edge cases (CORRECT)
  • User error cases
  • Unknown cases

14. A project manager is considering process improvements. They identify that their team is too slow when delivering a service. They have an educated guess about what’s causing the problem and how to fix it. What’s the term for this educated guess?

  • Control
  • Hypothesis (CORRECT)
  • Research
  • Variable

15. As a project manager, you identified a process-based problem you’d like to improve. Before implementing a solution, you conduct performance metrics and data collection. This establishes baseline data that will determine success. What DMAIC step did you apply?

  • Analyze (CORRECT)
  • Define
  • Control (INCORRECT)
  • Measure

16. As a project manager, you learn a customer is not satisfied with the quality of the finished product. To fix the problem, you first identify what you believe is the root cause and brainstorm solutions with your team. What PDCA step did you apply?

  • Plan (CORRECT)
  • Do
  • Check
  • Act

17. Which parts of a company ecosystem rely on continuous improvement to have collective and separate successes? Select all that apply.

  • Performances
  • Programs (CORRECT)
  • Projects (CORRECT)
  • Portfolios (CORRECT)

Correct: While the triple constraints are linked, the project manager must work to include the event’s changing requirements and scope.

18. Fill in the blank: The way a project manager decides to structure a retrospective depends on _____.

  • project sponsor preference (INCORRECT)
  • team and workplace (CORRECT)
  • the latest project management trends
  • the previous project manager’s agenda

19. What’s the main purpose of holding a retrospective?

  • Encourage improvements that prepare the team for future projects (CORRECT)
  • Allow the project manager to explain why the project did or did not succeed
  • Let stakeholders give feedback so the team can get a different perspective
  • Determine why the team missed a milestone and update the client

20. As a project manager, you’re overseeing the launch of a new product: a portable, solar-powered stove. Before beginning the project, you set a criteria for the desired outcome: It must maintain a specific cooking temperature for a set period of time. Which quality management concept does this criteria represent?

  • Quality planning
  • Quality standards (CORRECT)
  • Quality control
  • Assurance planning

21.  A project manager sets clear expectations with customers about when they’ll communicate certain project updates and changes. To gain the customers’ confidence, the project manager also provides situational examples of when they may communicate. Which soft skill does this project manager use with their customers?

  • Quality planning
  • Negotiation
  • Empathic listening
  • Trust-building (CORRECT)

22. During a user acceptance test (UAT), the users identify outliers that the original requirements didn’t account for, such as an extreme use of the product. What UAT quality control step does this represent?

  • Edge cases (CORRECT)
  • User error cases
  • Business cases
  • Unknown cases

23. A project manager is considering process improvements. They identify that their team is too slow when delivering a service. They have an educated guess about what’s causing the problem and how to fix it. What’s the term for this educated guess?

  • Research
  • Hypothesis (CORRECT)
  • Variable
  • Control

24. As a project manager, you identify a process-based problem you’d like to improve. To better understand the problem, you examine the technology to understand its root cause and interview the team on how it’s impacting their performance. Which DMAIC step did you apply?

  • Measure
  • Define
  • Control
  • Analyze (CORRECT)

25. As a project manager applying the PDCA process, you’ve already attempted to fix a process that you believe is causing a common customer complaint. As your next step, you compare your results to the goal to determine if you fixed the issue. What PDCA step will you apply?

  • Plan
  • Do
  • Check (CORRECT)
  • Act

26. Which parts of a company ecosystem rely on continuous improvement to have collective and separate successes? Select all that apply.

  • Projects (CORRECT)
  • Performances
  • Programs (CORRECT)
  • Portfolios (CORRECT)

27. Which of the following is a retrospective best practice?

  • Focus on more negative aspects than positive so the team can improve more quickly
  • Change perspectives so that the team can better understand another person’s point of view (CORRECT)
  • Assign blame so teammates know who did what wrong
  • Use “you” language to communicate clearly and reduce confusion across the team

28. What’s the main purpose of holding a retrospective?

  • Determine why the team missed a milestone and update the client
  • Allow the project manager to explain why the project did or did not succeed
  • Encourage improvements that prepare the team for future projects (CORRECT)
  • Let stakeholders give feedback so the team can get a different perspective

29. A project manager sets clear expectations with customers about when they’ll communicate certain project updates and changes. To gain the customers’ confidence, the project manager also provides situational examples of when they may communicate. Which soft skill does this project manager use with their customers?

  • Quality planning
  • Negotiation
  • Trust-building (CORRECT)
  • Empathic listening

30. During a user acceptance test (UAT), the project manager creates UAT scripts so the testers better understand the product or service. The project manager writes the scripts based on user stories, which are best described as what?

  • Feedback from users that includes positive comments, bug reports, and change requests
  • Communications that report on questions, issues, or delays during the testing process
  • Informal, general explanations of a feature that reflect the perspective of an end user (CORRECT)
  • Step-by-step instructions that users follow during the testing process

31. As a project manager, you identified a process-based problem you’d like to improve. Before implementing a solution, you conduct performance metrics and data collection. This establishes baseline data that will determine success. What DMAIC step did you apply?

  • Control (INCORRECT)
  • Define
  • Measure
  • Analyze

32. As a project manager, you learn a customer is not satisfied with the quality of a finished product. You have already identified the root cause and brainstormed solutions to the problem with the team. Now, you and the team attempt to fix the problem by implementing a solution. Which PDCA step did you apply?

  • Plan
  • Do (CORRECT)
  • Check
  • Act

33. A project team discovers an efficient process to more quickly develop a product. The program manager implements the idea in several other projects. When the portfolio manager learns that the more efficient process is working across several projects, they recommend it to several programs. This scenario exemplifies which best practice?

  • Positive feedback
  • Hierarchical communication
  • Continuous improvement (CORRECT)
  • Word-of-mouth communication

34. A team successfully delivers a product feature to a client, but misses the deadline. What should the project manager do to investigate why the product feature was late?

  • Hold a retrospective (CORRECT)
  • Meet with stakeholders
  • Add a team member
  • Increase the budget

35. As a project manager, you hold a retrospective. During the meeting, you give the team an opportunity to discuss risks that materialized: Were there any gaps between the original plan and its execution? Which retrospective step does this represent?

  • Future considerations
  • Next steps
  • Lessons learned (CORRECT)
  • Action items

36. Before running a process improvement experiment, a project manager needs to first identify processes to change and leave unchanged. What’s the experiment-related term for the unchanged process?

  • Variable group
  • Research group
  • Control group (CORRECT)
  • Comparable group

37. As a project manager, you learn a customer is not satisfied with the quality of a finished product. You have already identified the root cause and brainstormed solutions to the problem with the team. Now, you and the team attempt to fix the problem by implementing a solution. Which PDCA step did you apply?

  • Plan
  • Do (CORRECT)
  • Check
  • Act

38. During which step of the quality management process does a project manager ask questions such as: “How will I determine if the quality measures will lead to project success?” and “What outcome do my customers want at the end of this project?”

  • Quality action
  • Quality planning (CORRECT)
  • Quality assurance
  • Quality control

39. As a project manager, you hold a retrospective. During the meeting, you have a discussion about risks that could become issues if not addressed this quarter. You also inform the team that you’re passing ownership of the project to someone else. In the retrospective notes, you include the contact information of the new project manager and links to any relevant documentation. Which retrospective step does this represent?

  • Risks that materialized
  • Action items
  • Future considerations (CORRECT)
  • Lessons learned

40. As a project manager, you’re overseeing a product launch. You meet with customers to determine the product’s quality standards. Then, you create processes and documentation necessary to achieve the expected quality. Which quality management concept do these tasks represent?

  • Quality planning (CORRECT)
  • Assurance planning
  • Assurance standards
  • Quality control

41. Which quality management concept must be well-defined at the beginning of the project to help avoid rework and schedule delays?

  • Quality control
  • Quality action (INCORRECT)
  • Quality standards (CORRECT)
  • Quality assurance (INCORRECT)

42. As a project manager, you identified a process-based problem you’d like to improve, found its root cause,  and implemented a solution. Now, you monitor the new process to ensure the changes are beneficial to the team. Which DMAIC step are you currently applying?

  • Control (CORRECT)

43. During the user acceptance test (UAT), the users identify outliers that the original requirements didn’t account for, such as an extreme use of the product. What UAT quality control step does this represent?

  • Control (CORRECT)

Quality Management and Continuous Improvement CONCLUSION

This week, you learned how to manage quality using various techniques. You explored methods for effectively communicating with customers and different ways to measure customer satisfaction. You also looked at continuous improvement and process improvement techniques and how to conduct a retrospective during the project to improve processes.

Now that you’ve completed this week put your knowledge into practice by joining a course on Coursera.org. With over 4,000 courses available, you’re sure to find one that meets your needs.